Saturday, May 12, 2012

Gate Progress

I was able to get the gate frame stained and the arbor sections installed during this last week, despite the constant gloomy weather and rain.


I still need to add the top rails, bamboo panels, cooper caps for the support posts, and flashing for the top of the main posts. I also have to start thinking about door design.

No comments:

Post a Comment